by admin | Feb 26, 2025 | Case Study
Our Work Pre-Driven Recovery Roadway Pillars Case Study: Manufacture and Supply of Pre-Driven Recovery Roadway Pillars CLIENT: Yancoal MINE SITE: Moolarben SERVICE PROVIDED: Manufacture and Supply of Pre-Driven Recovery Roadway Pillars DATE: 2019 First PDRR...
by admin | Feb 25, 2025 | Case Study
Our Work Inter-seam Sealing of Heating Case Study: Supply equipment, materials and engineering services for the installation of MPA’s StrataPlug. CLIENT: Delta Coal MINE SITE: Chain Valley Colliery/Mannering Colliery SERVICE PROVIDED: Supply equipment, materials and...
by admin | Feb 24, 2025 | Case Study
Our Work Dyke removal and large void fill Case Study: Dyke Excavation and StrataFill® Installation at Integra Underground CLIENT: Glencore MINE SITE: Integra SERVICE PROVIDED: Supply of StrataFill®, a polymer modified foamed concrete as fill for area left from a...
by admin | Feb 23, 2025 | Case Study
Our Work Tahmoor 120 PSI Seals Case Study: Supply of Engineered 120 PSI Monolithic Plug Seals CLIENT: Simec Mining MINE SITE: Tahmoor SERVICE PROVIDED: Supply of Engineered 120 PSI Monolithic Plug Seals DATE: 2013-Present Project Overview As with all longwall mines in...
by admin | Feb 23, 2025 | Case Study
Our Work Ulan Underground Consolidated Barrier Pillars Case Study: Supply of engineered consolidated barrier seals. CLIENT: Glencore MINE SITE: Ulan Underground SERVICE PROVIDED: Supply of engineered consolidated barrier seals DATE: 2015 Project Overview As part of...