Our Case Studies showcase the expertise and innovation behind our mining solutions at Mine Projects Australia, highlighting successful projects such as monolithic seal installations, void filling and unique roadway support methods across key mining regions.

Pre-Driven Recovery Roadway Pillars

Pre-Driven Recovery Roadway Pillars

Moolarben Underground required an innovative approach to constructing pre-driven recovery roadway supports prior to advancing their 400-meter-wide longwall into the area.

Inter-seam Sealing of Heating

Inter-seam Sealing of Heating

The heating issue was identified in an inaccessible area of the mine and had experienced several events requiring active management over a long period.

Dyke removal and large void fill

Dyke removal and large void fill

Integra Underground excavated a large dyke from an active longwall block in the Maingate. The dyke was removed using shotfiring, after which formwork was installed and the resulting void was filled with StrataFill®.

Ventilation Shaft Seal and Capping

Ventilation Shaft Seal and Capping

Ashton Underground required a strategy to seal a disused ventilation shaft linking the pikes gully seam to the surface atmosphere. As a permanent seal, the Sealing had to comply with MDG 6001.