Mine Projects Australia



Home

What We Do

About Us

Our Products

Our Work

Contact Us

Our Work

Case Studies

Case Study Articles

Pre-Driven Recovery Roadway Pillars

Pre-Driven Recovery Roadway Pillars

Moolarben Underground required an innovative approach to constructing pre-driven recovery roadway supports prior to advancing their 400-meter-wide longwall into the area.

Inter-seam Sealing of Heating

Inter-seam Sealing of Heating

The heating issue was identified in an inaccessible area of the mine and had experienced several events requiring active management over a long period.

Dyke removal and large void fill

Dyke removal and large void fill

Integra Underground excavated a large dyke from an active longwall block in the Maingate. The dyke was removed using shotfiring, after which formwork was installed and the resulting void was filled with StrataFill®.