Moolarben Underground required an innovative approach to constructing pre-driven recovery roadway supports prior to advancing their 400-meter-wide longwall into the area.
Our Work
Case Studies
Case Study Articles
Inter-seam Sealing of Heating
The heating issue was identified in an inaccessible area of the mine and had experienced several events requiring active management over a long period.
Dyke removal and large void fill
Integra Underground excavated a large dyke from an active longwall block in the Maingate. The dyke was removed using shotfiring, after which formwork was installed and the resulting void was filled with StrataFill®.
Tahmoor 120 PSI Seals
As with all longwall mines in NSW, Tahmoor is required to seal their extracted longwall panels.
Ulan Underground Consolidation Barrier Pillars
As part of Ulan Underground’s longwall extraction plan, the mine had the requirement to segregate a series of longwall blocks from the next series.
Construction of Final Mine Seals
Mine Projects Australia was engaged by Donaldson Coal (Tasman Mine) to demobilise its three mine entries including installing the final mine seals.